| Home > Copper_parked_cutting_machine > Copper Parked Cutting Machine | ||
|
||
Copper Parked Cutting Machine |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]()
|
|
Cutting speed |
1-- |
|
Cutting accuracy |
|
|
Cutting length |
|
|
Cutting width |
|
|
| |
|
Cutting Thickness |
1270/max |
|
machine power |
4Kw |
|
Dimensions (L W H) |
19501900 |
|
19502300 | |
|
Working Face Height |
|
|
Machine Wight |
|
|
|
Rack machines from the main structure, the release Volume Expansion roller shaft, transmission, Guangdao institutions parts.
Cutting materials with volumes as shown in Figure 1, the release Volume 1 roller 2 through automatic tensioning devices and drive rollers 3 to 4 roll. And the rack-mounting the two servo motor drive belt driven through the drive rollers drive to achieve Feeding role. Cutting Device from the motor through absorption of the electromagnetic clutch eccentric driven rotary cutter Block 5 from top to bottom campaign materials to achieve the horizontal cutting action, the length of Paper by touch-screen adjustments "set parameters" to achieve. After cutting the material on the slopes themselves from the output.

Machinery installation and debugging
1) machine should be flat on the ground level, and a rack to rack such as plans to install fixed output in the cutting machine, and according to the appropriate height can be adjusted from top to bottom on its own.
2) connected to the wall rack diameter of a briefing for 8, 2 by adjusting the edge of the brass a governor valve to control the flow of blowing size, loosened the screws tight three-conditioning brass two outlet to the location of Flake materials to ensure the normal output and clean.
3) Turret, a diameter of 50 installed ventilation tube, and reprovisioning of the high-power vacuum cleaner connections, work should begin with vacuum cleaners.
4) Expansion of material into volume axis, by wearing diagram with copper, can be set in accordance with the operating manuals cutting length.
5) regulation of the companies cutting factory before regulate the gap knife from top to bottom, so only immediate use. When the blade with a blunt, subject to use after grinding, re-blade gap adjustment, as required adjustment to avoid collision damage blades.
6) When the upper and lower blade gap is too large to complete cutting, or replace the blade, the need to adjust the blade. Blade adjustment, switch off the power to transfer a hexagonal screw 1, Block moved to the next knife on the knife edge at the first gap left between 0.2 ~

Safe operation and maintenance
Dot put your hands to operators in the use of the machines on the knife-edge.
periodic (monthly)u replacement bearing butter, the butter to ensure clean, thereby extending the life of rolling bearings.
stop using, dust wiped off the milk, oil oru butter painted parts, particularly the blade to prevent corrosion.
firstu test, please observe the gap between the upper and lower blade to prevent the collision of two blades, blade and machine damage.
Related product:![]() Welding Wire Precision Layers Winding Machine |
![]() Copper Parked Cutting Machine |
| Product Classification | ||||||||||||
|
| Related News | ||
|
| Contact Info | ||||||
|
|
||
| © 2008 Derrison Machinery Copyright © Derrison Machinery The Professional supplier of Machinery Phone:86 571 88233073 Fax:86 571 88233092 |